Shadow mode first
Connectors and telemetry go in, models run against live production, and predictions are scored against what the mill actually made. Nothing is controlled.
Customers
No customer is named on this site yet, and no result is claimed. We are onboarding three to five design partners on one wedge workflow each, in shadow mode first. When a mill agrees to be named, it appears here with its own numbers.
Design partners
We are onboarding three to five design partners on one wedge workflow each, in shadow mode first. No mill is named on this site until it has agreed to be.
Connectors and telemetry go in, models run against live production, and predictions are scored against what the mill actually made. Nothing is controlled.
Right-first-time, seconds, water and energy are measured against the mill’s own trailing twelve months before any claim is made.
Design partners set the first wedge, approve every autonomy step, and decide if and when their numbers are published.
Design-partner programme
Three to five mills, one wedge workflow each, shadow mode first. The sequence comes from our MVP plan and does not change for anyone.
Phase 1
The wedge workflow is connected in shadow mode and the baseline for seconds, re-dyes and waste is measured from the mill’s own data.
Phase 2
The agent recommends yarn, construction and recipe moves and predicts defects and shade. An engineer approves each one, and accuracy is scored in the open.
Phase 3
Low-risk inspection, dye and finishing loops move to bounded auto-control one setpoint at a time. Exceptions escalate to a named person.
Phase 4
Adjacent modules are added within the same mill once the wedge holds its numbers. Publication of results is the mill’s decision.
Scenarios
Four deployments written as scenarios, because none has happened yet. Each one names the measure and how it would be taken.
Scenario · commission dyehouse, reactive exhaust jets
A standing recipe card that assumes one substrate and one water profile, against a reality of many greige suppliers and seasonal hardness swings.
Scenario · denim weaver and finisher, 148 cm
Manual inspection that cannot keep up with the finishing line, and graded rolls that the cutting room disputes every week.
Scenario · knit dyehouse, many shade families
Dye lots sequenced by whoever shouts loudest, so the plant pays for shade-family changeovers in water, steam and time.
Trust signals
No customer results are published yet. These are platform facts and plan terms from our own documents. Outcomes will be measured against each mill’s own trailing twelve months, in shadow mode before anything is controlled.
Mill agents, one per stage, from spinning to release.
Products in the loop: Vireon, Spindra, Loomix, Shadeon, Doffex and Twinly.
Design partners we are onboarding first, one wedge workflow each.
Per line per month on the Line plan. Mill and Enterprise sit above it.
Items marked ASPIRATIONAL are design targets ahead of production validation.
Run timeline
The same scenario run as an ordered timeline: step, status, duration and the tool result behind it. Inspection failed on one roll, the run recovered, replanned the cut and still held the ship date.
Goal: Dye lot DL-4471 · 3,180 kg · 40s combed cotton poplin · shade Indigo 19-4028 TCX · ΔE ≤ 0.8 · due Thu 06:00
Pulls greige genealogy for 14 rolls: yarn lots, loom, greige GSM 138, absorbency and residual size from the prep line.
agent Quality-and-Conformance
result ← 14 rolls · 3,180 kg · mean GSM 138.2 (σ 1.1) · prep OK
Omniverse fabric-line twin simulates the exhaust curve, machine loading and takt for three candidate recipes before a drop of dye is used.
agent Yield-and-Takt
result ← 3 candidates scored · best predicted ΔE 0.52 · 118 min cycle
Spectral recipe model proposes a 3-dye combination against the buyer standard, corrected for this substrate’s absorbency and the current water hardness.
agent Dye-and-Color
result ← 2.14% Navy RGB · 0.61% Blue BRF · 0.08% Black B · salt 62 g/L
Recipe deviates >5% from the standing card, so autonomy is capped: the colourist approves, rejects or edits before any dosing. Guardrail policy MILL-02/DYE-APPROVAL.
agent Dye-and-Color
result → awaiting colourist · approved on shift 04:18
Closed-loop dosing and ramp control against live bath spectrophotometry; two mid-cycle corrections applied when exhaustion ran 4% ahead of model.
agent Dye-and-Color
result ← exhaust 96.4% · 2 corrections · bath ΔE 0.41 at drain
Per-roll spectral read against Indigo 19-4028 TCX under D65/TL84/A; metamerism scored and rolls sorted into shade bands.
agent Shade-and-Quality
result ← mean ΔE 0.58 · 13 rolls band A · 1 roll band B
Stenter chemistry, overfeed and curing profile set to hold hand, 148 cm width and residual shrinkage under 3%.
agent Finish-and-Hand
result ← width 148.3 cm · shrink 2.1% warp / 1.4% weft
In-line vision flags a recurring 6 cm weft streak on roll 09 between 412 m and 445 m, traced to a stenter pin-chain slip, not a dye fault.
agent Defect-and-Inspect
result ← 1 defect cluster · roll 09 · 33 m affected · class WEFT_STREAK
cuOpt re-plans the cut and rework route: 33 m diverted to seconds, remaining 14,890 m re-sequenced so the buyer’s Thursday ship date still holds.
agent Yield-and-Takt
result ← 33 m to seconds (0.22%) · ship date held
Four-point grading, roll genealogy and the conformance packet (AATCC 61, ISO 105-C06, ZDHC MRSL declaration) are assembled and released to the buyer portal.
agent Quality-and-Conformance
result ← 13 rolls Grade A · 1 roll Grade B · packet signed
| Measure | Value | Context |
|---|---|---|
| Final mean ΔE | 0.58 | against a 0.80 tolerance |
| Re-dyes avoided | 1 | the standing card would have missed shade |
| Seconds | 0.22% | versus the scenario mill baseline of 1.9% |
| Water used | 46 L/kg | versus 59 L/kg on the scenario recipe card |
| Human decisions | 1 | the recipe approval gate |
Why this matters
A mill does not fail on the good lots. It fails on the lot where the substrate drifted, the recipe card was wrong, and nobody found out until the buyer opened the carton. Yarneon makes that lot legible while it is still in the machine.
Agent graph
This is the shape of a dye lot on Yarneon, shown as an illustrative scenario rather than a customer run. Ingest and simulation fan out, converge on a colourist approval gate, then dosing, verification, finishing, inspection and release. The accent traces the active path; every node opens in the inspector.
Scroll the graph sideways · or open the text equivalent below
| Step | Stage | Depends on | Status | Duration |
|---|---|---|---|---|
| ingest | conformance | none | SUCCEEDED | 0.8s |
| twin | simulate | ingest | SUCCEEDED | 46s |
| recipe | dye + colour | ingest | SUCCEEDED | 2.4s |
| approve | human gate | twin, recipe | APPROVAL | 4m 12s |
| dose | bath control | approve | SUCCEEDED | 118m |
| shade | verify ΔE | dose | SUCCEEDED | 9.1s |
| finish | stenter | dose | SUCCEEDED | 64m |
| inspect | vision | shade, finish | FAILED | 38m |
| rework | replan | inspect | SUCCEEDED | 1.6s |
| grade | release | rework | SUCCEEDED | 3.0s |
Use cases
Every deployment starts with one wedge workflow that pays for itself, then expands along the line.
Substrate-aware recipe prediction plus closed-loop exhaust control, with the colourist approving only what deviates.
Line-scan and NIR vision classify slubs, holes, streaks, stains, floats, barré and skew at full line speed, mapped to roll position.
Evenness and draft telemetry predict end-break clusters on ring frames and adjust before the frame sheds packages.
Warp and weft tension control across air-jet, rapier and circular-knit machines holds pick and course density inside tolerance.
Stenter chemistry, overfeed and curing profiles tuned per construction so finished goods pass dimensional-stability tests.
Spectral scoring sorts rolls into shade bands so no garment is cut from two shades.
Shade-family aware sequencing under delivery and machine constraints cuts changeovers, water and steam.
Vision-guided manipulators and AMRs take the lifting out of the job that mills cannot staff.
Roll genealogy, test methods and chemistry declarations assembled and signed at release.
Deployment
No mill hands over a jet on day one. The path is deliberately slow at the start and faster once the numbers hold. Durations are quoted after the assessment, because they depend on how instrumented the mill already is.
Phase 1
Mill survey, edge appliance install, connectors to machines, MES and meters. Telemetry starts flowing; nothing is controlled.
Phase 2
Models run in shadow against live production. Predictions are scored against what the mill actually produced, on your data.
Phase 3
The agent proposes; a human commits. Approval gates, setpoint envelopes and revert paths are agreed with the process owners.
Phase 4
Bounded auto-control on the setpoints you authorise, one at a time, with autonomy ceilings that you can lower at any moment.
Guardrails
Nothing here is a global "AI on" switch. Autonomy is granted per setpoint, bounded by policy, reversible by any operator and logged permanently.
Pricing
Priced per line, per mill or per group, with outcome-based components on the workflows where the value is measurable.
Mills validating ROI on a single wedge workflow.
Scaling mills adopting the full perceive–decide–act loop.
Integrated textile groups standardising on Yarneon.
Annual prepay saves 15 to 20% depending on term. Full detail, including outcome-based terms, on the pricing page.
Questions
Design partners set the first wedge, approve every autonomy step and decide whether their numbers are ever published.